IKEA Metod Kitchen Installation: What to Know Before You Buy
Quick answer
IKEA Metod is a strong-value kitchen system, but a good result depends on accurate planning, levelling units to out-of-square Dutch walls, and proper worktop and appliance fitting. Cabinets are typically โฌ3,000โโฌ8,000; professional installation of an average kitchen takes 3โ5 working days.
IKEA's Metod system is one of the most popular kitchen choices in the Netherlands, and for good reason: it's flexible, well-priced, and widely supported. But the gap between a Metod kitchen that looks built-in and one that looks flat-pack comes down to planning and installation.
Plan it accurately first
Use IKEA's planner, but measure the room carefully โ Dutch apartment walls are rarely square and floors are rarely level. Account for pipework, the meterkast, radiators, and door swings. Ordering the right fillers and cover panels up front avoids gaps at the ends of runs.
Installation is where it's won or lost
Cabinets must be hung level and plumb and scribed to uneven walls; worktops need clean, sealed joints; and appliances must be connected correctly. A professional fitter completes an average Metod kitchen in three to five working days. Gas hobs require a certified installer โ induction and electric setups can be connected as part of standard fitting.
Common mistakes to avoid
Skipping levelling, underestimating worktop cutting, forgetting the splashback, and assuming the old plumbing lines up with the new layout are the usual culprits. A fixed-scope installation quote that lists exactly what's included keeps the project predictable.
Frequently asked
IKEA offers an installation service through third parties, but many people use an independent fitter for more control over scheduling and scope. Either way, confirm who handles plumbing and appliance connection.
Related services
Kitchen Installation
Assembly and fitting of IKEA Metod, Bruynzeel, and other prefab kitchens โ including worktops, splashbacks, and non-gas appliance hook-up.
Apartment Renovation
End-to-end interior renovation for Dutch apartments โ strip-out, walls, floors, paint, kitchen, and bathroom delivered as one coordinated project.
More guides
How Long Does an Apartment Renovation Take?
A full apartment renovation in the Netherlands typically takes 2 to 4 weeks. Here's what determines where your project lands in that range.
Read guideHow Much Does a Kitchen Renovation Cost in the Netherlands?
A new kitchen in the Netherlands typically costs โฌ3,000โโฌ15,000+ installed, depending on the units, worktop, and appliances. Here's how the numbers break down.
Read guideApartment Renovation Checklist for Amsterdam Property Owners
Renovating an apartment in Amsterdam? This checklist covers VvE rules, permits, access, and scope โ the things that trip owners up before work even starts.
Read guidePlanning a renovation or reconstruction project?
Send us your project details and receive a clear, competitive quote.