What we offer

Renovation services across the Netherlands

Valterra Construction provides residential renovation work — apartment renovation, kitchens, bathrooms, flooring, painting, drywall, demolition, carpentry, and light electrical — across Amsterdam, Utrecht, Haarlem, and surrounding Dutch regions.

See these services applied in our completed renovation projects, or explore the cities we work in.

Apartment Renovation

Apartment renovation is the end-to-end interior renewal of a flat — combining demolition, walls, flooring, painting, kitchen, and bathroom work into a single managed project, typically completed in 2 to 4 weeks.

2–4 weeksView service

Kitchen Installation

Kitchen installation is the assembly and fitting of a prefabricated kitchen — carcasses, worktops, splashbacks, and non-gas appliances — usually completed in 3 to 5 working days for an average Dutch apartment kitchen.

3–5 working daysView service

Bathroom Installation

Bathroom installation is the full fit-out of a residential bathroom on a prepared substrate — tiling, shower, sanitaryware, and non-gas plumbing — typically completed in 1 to 2 weeks per bathroom.

1–2 weeksView service

Flooring

Flooring is the installation of residential floor systems on a prepared subfloor — laminate, vinyl, or tile — including self-levelling and skirting, usually completed in 1 to 4 days per apartment.

1–4 daysView service

Painting & Finishing

Painting and finishing is the final layer of an interior renovation — wall, ceiling, and trim coatings on properly prepared and skimmed surfaces, typically completed in 2 to 6 days for an apartment.

2–6 daysView service

Drywall & Ceiling Systems

Drywall and ceiling systems are the non-structural build-out of interior walls and ceilings — metal-stud or timber-frame plasterboard partitions and suspended or direct-fix ceilings — used to reshape a layout without touching the load-bearing structure.

2–5 daysView service

Demolition & Preparation

Demolition and preparation is the controlled strip-out of an existing interior — kitchens, bathrooms, flooring, and non-load-bearing walls — so a renovation can start on clean substrates, usually completed in 1 to 3 days.

1–3 daysView service

Doors & Carpentry

Doors and carpentry covers interior door sets, frames, and basic custom woodwork — installing or replacing internal doors, skirting, and architraves, plus smaller built-in carpentry, typically completed in 1 to 3 days.

1–3 daysView service

Light Electrical

Light electrical covers non-regulated finishing work — replacing existing sockets, switches, and light fixtures on already-energised circuits — typically completed in 1 to 2 days. Full rewiring and fuse-box work goes through certified electricians.

1–2 daysView service

Scope boundaries

Out-of-scope work — handled via certified Dutch partners

Valterra does not directly perform the following scopes, which require certified Dutch trade licences: load-bearing structural changes, gas installations, full rewiring, fuse-box (meterkast) replacement, foundation work, roof work, HVAC systems, permit (vergunning) handling, and structural engineering.

When a project needs any of the above, Valterra coordinates a certified partner under one combined quote — so the client signs one contract and gets one project manager.

Ready to start your project?

Tell us what you need and we'll provide a clear, competitive quote.