Apartment Renovation
Apartment renovation is the end-to-end interior renewal of a flat โ combining demolition, walls, flooring, painting, kitchen, and bathroom work into a single managed project, typically completed in 2 to 4 weeks.
An apartment renovation with Valterra is a single, fully coordinated project rather than a series of disconnected trades. We take a Dutch flat from strip-out to finished home โ demolition, new partition walls, levelled floors, fresh paint, a new kitchen, and a renovated bathroom โ managed end to end by one team under one fixed-scope quote.
How a full apartment renovation works
Work runs in clear phases: demolition and preparation first, then any new walls and ceilings, followed by flooring, kitchen and bathroom installation, and finally painting and finishing. Sequencing the trades correctly is what keeps a renovation on schedule โ each phase hands off cleanly to the next, with daily progress updates. Most apartments are completed in two to four weeks depending on size and scope.
What's included and what needs a partner
Valterra directly delivers all non-structural interior work. Scopes that require certified Dutch trade licences โ load-bearing structural changes, gas installations, full rewiring, and fuse-box (meterkast) replacement โ are coordinated through our certified partner network and folded into one combined quote, so you sign one contract and deal with one project manager.
Apartment Renovation in your city
Good to know
Apartment Renovation โ FAQs
Most apartment renovations in the Netherlands take two to four weeks, depending on the size of the flat and how much is being replaced. A cosmetic refresh can be faster; a gut renovation with new kitchen and bathroom sits at the upper end.
Related guides
How Long Does an Apartment Renovation Take?
A full apartment renovation in the Netherlands typically takes 2 to 4 weeks. Here's what determines where your project lands in that range.
Read guideApartment Renovation Checklist for Amsterdam Property Owners
Renovating an apartment in Amsterdam? This checklist covers VvE rules, permits, access, and scope โ the things that trip owners up before work even starts.
Read guideRelated services
Kitchen Installation
Assembly and fitting of IKEA Metod, Bruynzeel, and other prefab kitchens โ including worktops, splashbacks, and non-gas appliance hook-up.
Bathroom Installation
Wall and floor tiling, shower trays, walk-in showers, sinks, toilets, and non-gas plumbing coordination โ typically 1โ2 weeks per bathroom.
Flooring
Laminate, PVC, click vinyl, and ceramic tile installation with self-levelling underlayment and skirting trim work.
Need Apartment Renovation?
Tell us your scope and we'll return a clear, fixed-scope quote within 1โ2 business days.